BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Newcomen.com - ECPv6.17.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Newcomen.com
X-ORIGINAL-URL:https://www.newcomen.com
X-WR-CALDESC:Events for Newcomen.com
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20220327T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20221030T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20230326T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20231029T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20240331T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20241027T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20230411T180000
DTEND;TZID=Europe/London:20230411T200000
DTSTAMP:20230406T085141Z
CREATED:20230209T123647Z
LAST-MODIFIED:20230406T085141Z
UID:12220-1681236000-1681243200@www.newcomen.com
SUMMARY:‘The UK’s first Industrial Gas Turbine’ by Geoff Horseman
DESCRIPTION:The UK’s first industrial gas turbine was developed by CA Parsons & Co beginning in the 1930s. The machine ran for the first time in 1945. All of the key elements: compressor\, turbine\, combustion chamber\, exhaust heat exchanger and control technology were developed by CA Parsons & Co Ltd independently. The unit had to use the fuel available in WWII ie pool oil and was used to investigate the viability of operation on residual fuel oil and pulverised coal. Geoff Horseman\, formerly Chief Turbine Engineer at Siemens CA Parsons Works\, will tell the story of this machine using information and photos from the original development files. \nAbout The Lecturer\nGeoff Horseman worked at Parsons for 39 years from 1980 until 2019. He joined the Steam Turbine Design Dept in 1982 rising to Head of Turbine Design in 1991 and Head of Turbine-Generator Engineering in 1994. \nParsons became part of Siemens in 1997 and was joined by Westinghouse in 1998. Reorganisation led to the majority of new generator work moving to the Westinghouse sites while the majority of steam turbine work moved to the Mülheim-an-der-Ruhr and Newcastle sites. \nIn 1997\, Geoff was appointed Chief Turbine Engineer\, Siemens Power Generation. \nOn retirement in 2019\, with Siemens permission he began to document the Parsons history so that it can be preserved in the Tyne & Wear Archive and other institutions.
URL:https://www.newcomen.com/activity/the-uks-first-industrial-gas-turbine-by-geoff-horseman/
LOCATION:NEWCASTLE Discovery Museum\, Blandford Square\, Newcastle upon Tyne\, Tyne & Wear\, NE1 4HZ
CATEGORIES:UK - North East Branch
ATTACH;FMTTYPE=image/jpeg:https://www.newcomen.com/wp-content/uploads/2023/02/23-04-11_FirstUKIndustrialGasTurbine_1920x1080.jpg
END:VEVENT
END:VCALENDAR